Monitoring of the Ice Jamming Process in Rivers Using Spatiotemporal Plots of the Water Levels

L. S. Banshchikova

A methodology of plotting of the water levels along a river and its using for (1) finding places where ice jamming is possible, (2) estimation of the maximum levels caused by jams, and (3) estimation of risks of flooding in ungauged river sections is presented. For the Northern Dvina River case study, isolines of the 2003 river flood levels are plotted for the entire river length and places of possible jams are defined by using the proposed approach.

Joomla templates by a4joomla